Team 1 console

Keep the Lights On

CloudAI Corp is developing a new AI data center in Europe. Your mission: choose the power strategy that keeps the facility running 24/7.
Round 1 · Choose your site

1. Where should CloudAI Corp build?

Choose one site option. Each site has advantages and risks.

Round 2 · Secure the power

2. Which energy model do you propose?

Choose one main model.

Round 3 · Build the power package

3. What is the fastest credible connection route?

4. What is your redundancy design?

5. How do you make the supply low-carbon and firm?

6. Which contract package is most bankable?

7. How do you manage water and local acceptance?

Round 4 · Crisis response

8. Select your crisis card

The facilitator can assign a different crisis to each team. Select the crisis you received, then choose one response package.

9. Choose your response

Round 5 · Final pitch

Pitch structure

Your spoken pitch should cover: chosen site, energy model, why it works 24/7, main risk, mitigation strategy and why the client should select your team. The facilitator rates the pitch directly in the dashboard.

Generate team code

Send this code to the facilitator after your final choices are locked.